Grenadier build – sealed snorkel

The Doc just paid for the final work on Wally, being:

  1. install the diff breather kit;
  2. add rear airbags for towing the van (Poly Air, the ones also used on the van); and
  3. a bolt on a sealed snorkel. It is a bolt on job, no cutting. GrenX’s final development of the diesel airbox is now complete. Rohan confirmed to me last Friday at the 4WD and Adventure Show.

The Doc has some DIY things to do, but GrenX will do the final work. The Doc needs to book the trip to Melbourne. The Doc organized the final work with GrenX at the Sydney 4WD and Adventure show.

Watching the Grenadiers do water crossings up at Cape York in the Canny Outdoor video was the final prompt.

Leave a Reply